显示标签为“processor”的博文。显示所有博文
显示标签为“processor”的博文。显示所有博文

7/19/2018

TSMC's performance in the second half of the year will rise sharply: each processor is the focus

TSMC's revenue in April-June continued to decline, which caused investors to worry that the impact of the off-season cycle in the first half of the year, smartphone shipments were not as expected, and the collapse of the digital currency market also led to the decline of ASIC chips, affecting the performance of TSMC. However, in the two quarters of the second half of 2018, TSMC's Q3 and Q4 quarter revenues are expected to continue to grow, mainly due to the smart phone season in the second half of the year, Apple will mass produce 7nm A12 chips, Huawei HiSili will also launch 7nm Kirin 980 chip, NVIDIA's next-generation GPU will also be shipped in Q4.

In the past June, TSMC's revenue decreased by 13% from the previous month. The total revenue in Q2 decreased by 6%. The revenue was NT$233.28 billion, equivalent to US$7.63 billion. The decline was mainly due to the bite mainland mining machine. The chip and NVIDIA's GPU chip orders declined. However, in the second half of the year, TSMC's revenue will continue to rise. Digitimes quoted industry insiders as saying that the processors used in the new iPhone and Huawei Mate series phones have already started mass production. The revenue of TSMC in Q3 and Q4 will resume continuously. Growth, in which Q3 quarter growth is relatively mild, Q4 quarter will reach the highest level in history.

The processor used by Apple's iPhone is still the main growth driver of TSMC. This year, Apple will launch three iPhones, and the processor will be upgraded to A12, which will use TSMC's 7nm process.

TSMC predicts that iPhone handset processor shipments will peak between October and November, but sources say TSMC will also OEM Huawei's Kirin 980 processor, which is also a 7nm process and is expected to be in the Mate 20 series. Starting on the phone.

In addition to orders from Apple and Huawei's mobile phone processors, NVIDIA's next-generation GPU orders will also become the growth driver for TSMC's Q4 quarter. For us, this news is actually more interesting. What is the NVIDIA chip in Q4? At the end of August this year, NVIDIA is said to release a new 12nm process Turing graphics card. It is reasonable to say that the stocking peak should be in the Q3 quarter. If it is a 12nm process chip, it is unlikely that the shipment will peak in the Q4 quarter.

Digitimes also broke the news that TSMC will produce 7nm chips for NVIDIA in Q4 quarter, but it will not be released until early next year. This stocking cycle is much more reasonable.

There are many different opinions about NVIDIA's 7nm chips. The existing analysis believes that the GPU released in Q3 is based on the 12nm process. Both the Volta architecture and the Turing Turing architecture are the same, but there are also sporadic reports that NVIDIA will skip the 12nm process node. Directly introduced 7nm process chip.

Follow Me
Link:Tenco

                                                                   ——END——

6/01/2018

Four AMD new processor products exposure

AMD's current flagship processors include the second-generation Ruilong and 8-generation APU (Ryzen 5 2400G/3 2200G), but the lineup is still not neat.

According to German CB report, ASRock AB350M Pro4 motherboard compatibility list, inadvertently confirmed four new AMD processor products, but after the media kicked off, the official has been quickly removed.

Specifically, they are -

Ryzen 3 2300X: 3.5GHz base clock, 65W, 2MB L2 cache

Ryzen 5 2500X: 3.6GHz Base Clock, 65W, 2MB L2 Cache

Ryzen 5 2600E: 3.1GHz Base Clock, 45W, 3MB L2 Cache

Ryzen 7 2700E: 2.8GHz Base Clock, 45W, 4MB L2 Cache

Among them, Ryzen 3 2300X will become the most entry-level product in the second-generation Ruilong CPU family, with four cores and four threads, 8MB three slow, and thermal design power 65W.

At the same time under the Ryzen 2600 also added Ryzen 5 2500X, four-core eight-thread design, 16MB three slow, power consumption is also 65W.

As for the Ryzen 5 2600E/7 2700E with the tail E suffix, it is an energy-saving version, and the power consumption is reduced by 45W, which is mainly due to the sharp drop in frequency.

Because the Ruilong CPU itself does not have an integrated GPU, the Ryzen 3 2300X and other current Sharp APUs are still differentiating. In addition, the Athlon 200GE with integrated Vega 3 GPU has also been exposed a few days ago, with dual-core 35W, and the price may go down to 600. Within the dollar.

The last thing to say is that at the Taipei Computer Show, AMD will release the second-generation thread ripped processor if there is no accident.

Robot shopping guide wins over real person shopping guide by nearly 90% of users welcome

To the person that loves shopping, a good guide is bought be like close close small boudoir honey, let a person be like mu chun feng, enjo...